The Festiniog Railway from 1950

Andrew Wilson (Author)
Usually delivers within 2 weeks.

Description

The Festiniog Railway can trace its history back to 1829 and it was constructed to serve the slate quarries in the area. It was built to the gauge of 2ft as this was the track width used in the quarries. Originally powered by gravity and horses, by 1863 steam had come to the line. In 1869 the first Fairlie-designed double locomotive appeared. The railway was built to serve the slate trade but by the First World War trade had declined due to a number of factors. Passenger traffic was by then the mainstay of trade and the summer tourists kept the line in profit. But the Second World War was to see the closure of the line. It lay after the war, neglected and vandalised, until 1950 when steps were made towards preservation. By 1954 that had become a reality and the wonderland of Wales was back up and running. Today it is one of the best known of Wales' narrow gauge railways.

Product Details

Price
£12.99  £12.08
Publisher
The History Press Ltd
Publish Date
1 August 2002
Language
English
Type
Paperback
EAN/UPC
9780752423975

Earn By Promoting Books

Earn money by sharing your favourite books through our Affiliate programme.

Become an Affiliate
We use cookies and similar methods to recognize visitors and remember their preferences. We also use them to help detect unauthorized access or activity that violate our terms of service, as well as to analyze site traffic and performance for our own site improvement efforts. To learn more about these methods, including how to disable them view our Cookie Policy.